An investment committee pack built in four days
Quarterly reporting consumed four analysts for most of a month. We modelled the holdings data once and reduced the pack to a scheduled run plus review.
- Pack preparation
- 18 → 4 days
- Analyst days saved
- 56/qtr
- Figures reconciled
- 100%
- Time to first value
- 6 wks
The situation
Kestrel produced a quarterly investment committee pack from a custodian feed, an internal valuation sheet and three spreadsheets maintained by different analysts.
Preparation took eighteen working days and most of four people. Because the figures were assembled by hand, every number was checked twice before the pack went out, which consumed much of the remaining time.
Constraints
The partners trusted the existing numbers and were not willing to accept a new figure without being able to see how it was derived. Lineage was therefore not a nice-to-have but the condition for adoption.
What we did
We modelled holdings, valuations and fees into one layer, with every figure in the pack traceable to the record it came from. The sixty-one manual spreadsheet steps reduced to three, all of them genuine judgement calls rather than data assembly.
For the first quarter both processes ran in parallel and the outputs were compared line by line. They matched on the second attempt, after we found a fee accrual the old sheet had been applying a month late since 2021.
Result
The pack now takes four days, one of which is review. The analysts who used to assemble it are working on the manager selection analysis the partners had been asking for since 2023.
Results
| Measure | Before | After |
|---|---|---|
| Working days to produce the pack | 18 | 4 |
| Analysts involved | 4 | 1 |
| Manual spreadsheet steps | 61 | 3 |
| Figures traceable to source | Partial | 100% |
We did not want faster reporting. We wanted to stop checking it twice. We got both.
Marcus ElderManaging Partner, Kestrel PartnersWhat we left behind
- A project in the client's own repository, with tests and CI
- Documented definitions with named owners
- Runbooks for every scheduled job, written for a non-engineer
- Two weeks of training for the team taking it over
Other engagements you might want to read
Tell us which number you cannot trust